Roadway Reconstruction

Over time, when heavy damage affects both the pavement and sidewalk on a roadway, the roadway may require full reconstruction.

When reconstruction occurs, the City performs full depth roadway resurfacing, sidewalk replacement, and pedestrian access ramp repair and/or replacement.

Due to the extensive work required during reconstruction, the City must commit a large capital investment. Particular care and effort is made in coordinating reconstruction projects with all utility companies and private contractors to ensure the longevity of a reconstructed roadway.

Reconstructed roadways are expected to maintain their integrity for a minimum of twenty years.

  • Resurfaced Street 75x75

    Street Resurfacing Program

    Construction season runs from April 1st to November 30th. During this time, Public Works will oversee the resurfacing or reconstruction of over 200 City streets.

    View List of Streets to be Resurfaced »